Fish-Protection Structure at Svetlogorskaya CHPP

Year: 2007

Project: Fish-Protection Structure at Svetlogorskaya CHPP

Fish-protection structure at Svetlogorskaya CHPP.  Bank of Berezina River. Dewatering was carried out by 13 wells with a capacity of 65 m3/h each.

Dewatering depth – 7m.

Construction period – 4 months.

Artificial dewatering of groundwater is an integral part of construction work in certain cases. Work conducted at high groundwater level requires special measures to protect existing and newly erected buildings and prevent pit instability. Dewatering systems have to operate continuously throughout the entire construction period.

Delta Drilling Company carried out the whole scope of work from design to project implementation.

 