Versatile Bauer RTG RG 19T drilling rig (Germany)
Options:
- Construction of sheet pile (retaining) walls
- Installation of sheet pile (retaining) walls.
- Installation of bored piles by vibration with diameter up to 1000 mm.
- Vibratory driving of casings with diameter up to 1000 mm.
- Extraction of casings and sheet piles
Technical specifications:
- Overall height 20.6 m
- Max. length of piles 16 m